Rio Tinto, Hancock Prospecting to develop $1.61 billion Hope Downs 2 project

  • Posted on June 24, 2025
  • By Yahoo News
  • 2 Views
Rio Tinto, Hancock Prospecting to develop $1.61 billion Hope Downs 2 project

Hope Downs 2 project, containing the Hope Downs 2 and Bedded Hilltop deposits, is a joint venture between Rio and Hancock Prospecting with both parties holding equal stakes. The two iron ore pits will have a combined total annual production capacity of 31 million metric tons, Rio said in a statement.
continue reading...

Author
Yahoo News

You May Also Like